Client Challenge
A 10-story commercial plaza faced high electricity bills due to poor power factor and unmanaged peak demand. Monthly penalties of PKR 180K.
Implemented automatic power factor correction and intelligent load management, eliminating PKR 180K monthly utility penalties.
Industry
Commercial Buildings
Location
Pakistan
Solution
Industrial Automation Integration
Primary Outcome
Power factor: 0.70 to 0.98
Answer-first summary for technical buyers, consultants, and AI-assisted research workflows.
A 10-story commercial plaza faced high electricity bills due to poor power factor and unmanaged peak demand. Monthly penalties of PKR 180K.
Existing site architecture included mixed power sources and required structured integration for stable operations.
Control strategy design, panel-level integration, commissioning workflow, and operational handover.
Comprehensive electrical system upgrade including automatic power factor correction, load management, and tenant sub-metering.
Installed 600kVAR capacitor bank with harmonic filters, PLC-based load control, and 12 sub-meters over 9 weeks.
Protection and compliance controls included reverse power protection, configurable alarms, and controlled switching logic based on site conditions.
Power factor improved from 0.70 to 0.98, eliminated PKR 180K monthly penalties, achieved 12% overall energy savings.
Electrical SLD snapshots, HMI/SCADA views, panel documentation, and commissioning records.
A 10-story commercial plaza faced high electricity bills due to poor power factor and unmanaged peak demand. Monthly penalties of PKR 180K.
Installed 600kVAR capacitor bank with harmonic filters, PLC-based load control, and 12 sub-meters over 9 weeks.
Power factor: 0.70 to 0.98, PKR 180K/month penalty eliminated, 18% peak demand reduction, 12% overall energy savings, 10.5-month payback period
Share your load profile, control objectives, and site constraints. We will propose architecture options, implementation scope, FAT/SAT plan, and support model.