Commercial BuildingsPV-DG SynchronizationCompleted Sept 2026

PV-Generator Synchronization for Mall Of Multan

PV-Generator synchronization system with Limited Export cloud-based monitoring.

Industry

Commercial Buildings

Location

Multan, Punjab

Solution

PV-DG Synchronization

Primary Outcome

Reliability Improvement

PV-Generator Synchronization for Mall Of Multan project overview

Client Challenge

Mall of Multan needed automatic coordination between its solar PV system and backup generator, protection against reverse power feed into the generator, and remote visibility into system performance.

Scope of Work

Installation of a PV-Generator synchronization system for Mall of multan

Solution Architecture

Automatrix Engineering supplied a PV-Generator synchronization controller featuring Limited Export functionality, generator reverse power protection, and cloud-based controlling and monitoring.

Implementation & Commissioning

The controller integrates the PV system with the site generator, enforcing Limited Export limits and reverse power protection on the generator, with all parameters accessible remotely through cloud monitoring.

Components, Technologies, and Protocols

Components Used

  • • SCADA
  • • PLC/HMI
  • • Modbus RTU/TCP
  • • Generator Synchronization

Technologies

SCADAPLC/HMIModbus RTU/TCPGenerator Synchronization

Protocols / Interfaces

  • • Modbus

Results and Measurable Outcomes

Quantified performance results (e.g. fuel savings, uptime) have not yet been recorded for this site. As installed, the system delivers Limited-export compliance, generator reverse-power protection, and 24/7 remote visibility.

  • Improved power reliability
  • More stable source coordination
  • Improved operational visibility
  • Reduced manual intervention
  • Improved fault response readiness

Project FAQ

What was the primary challenge in PV-Generator Synchronization for Mall Of Multan?

Mall of Multan needed automatic coordination between its solar PV system and backup generator, protection against reverse power feed into the generator, and remote visibility into system performance.

How was the solution implemented?

The controller integrates the PV system with the site generator, enforcing Limited Export limits and reverse power protection on the generator, with all parameters accessible remotely through cloud monitoring.

What outcomes were delivered?

Improved power reliability, More stable source coordination, Improved operational visibility, Reduced manual intervention, Improved fault response readiness

Discuss a Similar Project

Share your load profile, control objectives, and site constraints. We will propose architecture options, implementation scope, FAT/SAT plan, and support model.