Skip to main content
Industrial power control · Pakistan

Control Solar, Grid and Generators as One Reliable Power System

Automatrix Engineering designs and commissions PLC-based PV-DG synchronization, zero-export and SCADA systems for industrial facilities that need safe generator loading and clear operational visibility.

Industrial & commercial sites
Multi-brand integration
Commissioning & handover

Control architecture

Live power coordination

Site-specific logic

Solar PV

Available generation and inverter limits

Utility Grid

Import, export and availability status

Diesel Generator

Loading, frequency and protection status

PLC / Energy Controller

Calculates setpoints, ramps solar output, applies interlocks and manages operating modes

Plant Load

Reliable power within agreed operating limits

SCADA / HMI

Live flow, alarms, trends and reports

Common operating problems

Solar capacity alone does not create a safe hybrid power system

The control system must respond to changing load, source availability and generator limits without depending on repeated manual intervention.

!

Generator loading becomes unsafe

Solar production can reduce generator loading below the site operating limit unless inverter output is controlled dynamically.

!

Export or reverse power is uncontrolled

Grid and generator operating modes require different limits, measurements and protection responses.

!

Operators depend on manual switching

Manual curtailment is slow, inconsistent and difficult to verify across multiple inverters and generators.

!

No single operational view exists

Power meters, generator controllers and inverter portals often show separate data without one control picture.

System capability

One control layer for the complete operating scenario

The solution is engineered around the actual single-line diagram, generator constraints, inverter interfaces and required operating modes. It is not a generic consumer energy device.

Important: fuel and energy results depend on the site load profile, solar availability, generator minimum-loading requirement and existing operating method. Any saving estimate must be site-specific.
01

Solar output control based on plant load, grid flow and generator loading

02

Grid-connected, zero-export, controlled-export and generator-support modes

03

Multi-inverter and multi-generator integration through industrial protocols

04

Generator minimum-load, reverse-power, frequency and voltage safeguards

05

PLC/HMI or SCADA dashboards for live status, trends, alarms and reports

06

Local control that continues operating when cloud connectivity is unavailable

Savings and payback estimate

PV-DG Savings & Payback Estimator

Choose a quick estimate or add measured site data. The result is presented as a clear management brief.

Plant information

Current operating data

Fuel use

Estimated diesel use

Enter generator rating and average loading.

Fuel price

Loading…

Engineering workflow

From site data to commissioned control

01

Technical discovery

Review the single-line diagram, load profile, solar plant, generator ratings, metering and operating constraints.

02

Control philosophy

Define operating modes, setpoints, interlocks, fallback states, ramp rates and protection boundaries.

03

Engineering & integration

Configure the panel, PLC, communications, HMI/SCADA and interfaces to meters, generators and inverters.

04

Testing & handover

Complete FAT/SAT, controlled site testing, operator training, documentation and agreed support arrangements.

Next step

Request a site-specific technical assessment

Share the available plant information. The initial review helps determine compatibility, missing data and the most practical next engineering step.

Phone: +92-370-7470778

Email: info@automatrix.pk

Service area: Industrial projects across Pakistan, subject to scope and site access.

Have an SLD, BOQ or load profile? Mention it in the form. The engineer can request the document securely during follow-up.

Technical assessment

Share Your Power-System Details

An engineer will review the operating scenario and contact you for the next technical step.

By submitting, you agree to be contacted about this requirement. See our Privacy Policy.

No residential enquiries. Industrial and commercial projects only.

Technical questions

Frequently asked before an assessment

Can the system work with different inverter brands?

Integration depends on the model, available control interface and communication documentation. The assessment confirms compatibility before the final architecture is proposed.

Does PV-DG control require replacing the existing solar system?

Often it can be added to an existing installation. The required changes depend on inverter control access, metering locations, generator controllers and the existing electrical design.

Can the controller support zero export when the grid is available?

Yes, where suitable metering and inverter-control interfaces are available. Grid and generator modes are engineered separately so each mode uses the correct limit and protection logic.

How much diesel will the system save?

Savings are site-specific. They depend on plant load, solar availability, generator minimum loading, operating hours and current control practices. Use the estimator for a preliminary range; final figures require site data and engineering review.

Need to discuss an active generator or export-control problem?

Contact Automatrix Engineering with the current operating scenario and available site data.