Skip to main content
Food ProcessingPV-DG SynchronizationCompleted Oct 2024

PV Generator Synchronization & Zero Export System for Karachi Grains

A PV Generator synchronization system with reverse power protection, Zero Export control, and cloud monitoring deployed for Karachi Grains Private Limited, a food processing facility.

Industry

Food Processing

Location

Karachi, Pakistan

Solution

PV-DG Synchronization

Primary Outcome

Better export compliance

PV Generator Synchronization & Zero Export System for Karachi Grains project overview

Client Challenge

Karachi Grains needed to run solar and generators together without risking reverse power flow into the Generator or unauthorized export to the WAPDA grid, while keeping visibility into performance from anywhere.

Scope of Work

Synchronize the plant's PV solar array with backup diesel generators while ensuring full grid-export compliance and generator protection.

Solution Architecture

Automatrix Engineering installed a PV Generator synchronization controller with dedicated reverse-power protection for the generator and an automatic zero-export controller to keep the site fully compliant with grid rules.

Implementation & Commissioning

The team commissioned the PLC-based controller, configured cloud and local monitoring dashboards, and set up customized reporting so the client can track generation and consumption remotely.

Components, Technologies, and Protocols

Components Used

  • Zero Export Controller
  • Generator Synchronization
  • PLC/HMI

Technologies

Zero Export ControllerGenerator SynchronizationPLC/HMI

Protocols / Interfaces

  • Not publicly documented for this project.

Results and Measurable Outcomes

The facility now runs solar and generator power in sync with Zero Export violations, protected generators, and full remote visibility into plant performance.

  • Better export compliance
  • Reduced manual intervention

Project FAQ

What was the primary challenge in PV Generator Synchronization & Zero Export System for Karachi Grains?

Karachi Grains needed to run solar and generators together without risking reverse power flow into the Generator or unauthorized export to the WAPDA grid, while keeping visibility into performance from anywhere.

How was the solution implemented?

The team commissioned the PLC-based controller, configured cloud and local monitoring dashboards, and set up customized reporting so the client can track generation and consumption remotely.

What outcomes were delivered?

Better export compliance, Reduced manual intervention

Discuss a Similar Project

Share your load profile, control objectives, and site constraints. We will propose architecture options, implementation scope, FAT/SAT plan, and support model.