Client Challenge
Zimal Textile was running a 500 KW solar PV system alongside a 630 KVA WAPDA grid connection and two 100 KVA diesel generators, with no automatic synchronization between these sources. Switching between solar, grid and generators required manual intervention, risking unstable voltage/frequency transitions and preventing the plant from reliably prioritizing cheaper solar power over diesel.