Skip to main content
IndustrialPV-DG SynchronizationCompleted Aug 2026

PV-Generator Synchronization for Evoo Cable

PV-Generator synchronization system with Limited Export and cloud-based monitoring.

Industry

Industrial

Location

Lahore, Punjab

Solution

PV-DG Synchronization

Primary Outcome

Reduced manual intervention

PV-Generator Synchronization for Evoo Cable project overview

Client Challenge

EVO Cable Industry required automatic coordination between its solar PV system and backup generator, limited power export to the grid, protection against reverse power flow to the generator, and remote monitoring of system performance. Specific pain points and system sizing were not documented and should be confirmed with the client before publication.

Scope of Work

Installation of a PV-Generator synchronization system for Evoo Cable.

Solution Architecture

Automatrix Engineering supplied a PV-Generator synchronization controller featuring Limited Export functionality, generator reverse power protection, and cloud-based controlling and monitoring.

Implementation & Commissioning

The controller integrates the PV system with the site generator, enforcing limited Export limits and reverse power protection on the generator, with all parameters accessible remotely through cloud monitoring.

Components, Technologies, and Protocols

Components Used

  • • Generator Synchronization
  • • Limited Export Control

Technologies

Generator SynchronizationLimited Export Control

Protocols / Interfaces

  • Not publicly documented for this project.

Results and Measurable Outcomes

Quantified performance results (e.g. fuel savings, uptime) have not yet been recorded for this site. As installed, the system delivers zero-export compliance, generator reverse-power protection, and 24/7 remote visibility.

  • Reduced manual intervention
  • Improved power reliability
  • Improved operational visibility

Project FAQ

What was the primary challenge in PV-Generator Synchronization for Evoo Cable?

EVO Cable Industry required automatic coordination between its solar PV system and backup generator, limited power export to the grid, protection against reverse power flow to the generator, and remote monitoring of system performance. Specific pain points and system sizing were not documented and should be confirmed with the client before publication.

How was the solution implemented?

The controller integrates the PV system with the site generator, enforcing limited Export limits and reverse power protection on the generator, with all parameters accessible remotely through cloud monitoring.

What outcomes were delivered?

Reduced manual intervention, Improved power reliability, Improved operational visibility

Discuss a Similar Project

Share your load profile, control objectives, and site constraints. We will propose architecture options, implementation scope, FAT/SAT plan, and support model.