Skip to main content
HealthcarePV-DG SynchronizationCompleted Mar 2026

PV-Generator Synchronization for Rabia welfare Hospital

PV-Generator Synchronization system with Zero Export Rabia welfare Hospital

Industry

Healthcare

Location

Pakistan

Solution

PV-DG Synchronization

Primary Outcome

Reliability Improvement

PV-Generator Synchronization for Rabia welfare Hospital project overview

Client Challenge

Rabia welfare Hospital Industry required automatic coordination between its solar PV system and backup generator,Zero power export to the grid, protection against reverse power flow to the generator, and remote monitoring of system performance.

Scope of Work

Installation of a PV-Generator synchronization system for Rabia welfare Hospital

Solution Architecture

Automatrix Engineering supplied a PV-Generator synchronization controller featuring Zero Export functionality, generator reverse power protection, and cloud-based controlling and monitoring.

Implementation & Commissioning

The controller integrates the PV system with the site generator, enforcing Zero Export limits and reverse power protection on the generator, with all parameters accessible remotely through cloud monitoring.

Components, Technologies, and Protocols

Components Used

  • • SCADA
  • • PLC/HMI
  • • Modbus RTU/TCP
  • • Generator Synchronization

Technologies

SCADAPLC/HMIModbus RTU/TCPGenerator Synchronization

Protocols / Interfaces

  • • Modbus

Results and Measurable Outcomes

Quantified performance results (e.g. fuel savings, uptime) have not yet been recorded for this site. As installed, the system delivers zero-export compliance, generator reverse-power protection, and 24/7 remote visibility.

  • Reduced manual intervention
  • Better export compliance
  • Improved fault response readiness
  • More stable source coordination

Project FAQ

What was the primary challenge in PV-Generator Synchronization for Rabia welfare Hospital?

Rabia welfare Hospital Industry required automatic coordination between its solar PV system and backup generator,Zero power export to the grid, protection against reverse power flow to the generator, and remote monitoring of system performance.

How was the solution implemented?

The controller integrates the PV system with the site generator, enforcing Zero Export limits and reverse power protection on the generator, with all parameters accessible remotely through cloud monitoring.

What outcomes were delivered?

Reduced manual intervention, Better export compliance, Improved fault response readiness, More stable source coordination

Discuss a Similar Project

Share your load profile, control objectives, and site constraints. We will propose architecture options, implementation scope, FAT/SAT plan, and support model.