Skip to main content
ManufacturingPV-DG SynchronizationCompleted Dec 2024

Smart Energy Automation System for Techno Glass, Karachi

An integrated automation system synchronizing three solar inverters, a diesel generator and grid connection into one smart power management solution for a glass manufacturing plant.

Industry

Manufacturing

Location

Karachi, Pakistan

Solution

PV-DG Synchronization

Primary Outcome

Improved operational visibility

Smart Energy Automation System for Techno Glass, Karachi project overview

Client Challenge

Techno Glass Karachi's three solar inverters, diesel generator, and grid connection operated without unified control, creating inefficiencies in load handling and limiting visibility into system performance.

Scope of Work

Project scope details are available from the engineering team.

Solution Architecture

Automatrix implemented a comprehensive automation system with PLC and HMI control, unifying all three power sources under one dynamic load-handling and source-priority logic.

Implementation & Commissioning

Delivered full local and remote access via web dashboard and mobile app, a lifetime cloud subscription for 24/7 monitoring, historical data logging for operational analysis, flexible zero-export or net-metering-compliant maximum export modes, and generator reverse power protection.

Components, Technologies, and Protocols

Components Used

  • PLC/HMI
  • Zero Export Controller

Technologies

PLC/HMIZero Export Controller

Protocols / Interfaces

  • Not publicly documented for this project.

Results and Measurable Outcomes

Techno Glass now maximizes solar usage, minimizes fuel consumption, and maintains consistent power quality, supporting both production continuity and sustainability targets.

  • Improved operational visibility
  • Improved power reliability

Project FAQ

What was the primary challenge in Smart Energy Automation System for Techno Glass, Karachi?

Techno Glass Karachi's three solar inverters, diesel generator, and grid connection operated without unified control, creating inefficiencies in load handling and limiting visibility into system performance.

How was the solution implemented?

Delivered full local and remote access via web dashboard and mobile app, a lifetime cloud subscription for 24/7 monitoring, historical data logging for operational analysis, flexible zero-export or net-metering-compliant maximum export modes, and generator reverse power protection.

What outcomes were delivered?

Improved operational visibility, Improved power reliability

Discuss a Similar Project

Share your load profile, control objectives, and site constraints. We will propose architecture options, implementation scope, FAT/SAT plan, and support model.